Modest

The super structure like footings, columns, beams and stair same for all construction cost variance, the price difference of this modest construction cost is because of the finishing materials used using like bricks(Rs.7.50 to Rs.9 per piece) sand,m sand or Robo sand for concrete structure and wall building and river sand for plastering,flooring material( rupees 50 to 60 per piece), wall and floor tiles for bathroom and kitchen( rupees 35 to 40 per square feet), doors and frames( Rupees 6500 each) and Windows( Rs 11500 each) ventilators( rupees 2800 each) electrical cables And Fixtures like switches( rupees 32 each) and Socket( rupees 38 each), plumbing materials like water pipes, sanitary wares like WC( rupees 3000 each), bath fittings like taps( rupees 650/e) Hot and Cold mixer( rupees 3800 each), showers( rupees 600/E), angle cocks( rupees 585/E), drainage pipes, paint materials( rupees 320 per litre), fabrication work like stairs and balcony railings( SS Steel) and window grills( MS Steel) exterior elevation moderate cost in the modest construction.

Other cost factors

There are few more cost factors that need to be considered like approval or permission fee (this is usually a per sq ft charge by the municipality) electricity connection cost,water connection cost and sewage connection charge(This need to be paid to respective govt people),borewell,underground sump,compound wall and gate etc... Interior works like false ceiling and modular kitchen.Construction cost pertain only to the constructed area ,where ever roof is present that is considered as constructed area.

Call us!